Licensed site inspection
We walk the lot, read setbacks, slope, and access, and photograph it (drone included).
Build Feasibility Reports
A licensed contractor's site feasibility report: we visit your lot, read setbacks, slope, and soil, cross-check county code, and hand you a plan and a real build outlook — usually within three business days.
A feasibility report is the cheapest way to find out — before you spend — whether a lot can be built on, and what it'll take.
Before you buy raw land or commit to a build, a site feasibility report tells you what you're actually dealing with: setbacks, slope, a hands-on soil read, drone photos, county and health-department constraints, and a build-cost outlook.
It's the first step of every project we do — and it's credited toward your project if you move forward, so it's not a sunk cost, it's a deposit on work that counts.
You get it back fast — typically within three business days — so you can make a real decision instead of a hopeful one.
We walk the lot, read setbacks, slope, and access, and photograph it (drone included).
A hands-on soil assessment and a cross-check against county and health-department code.
A plan for the site and a realistic build-cost outlook — no blind guesses.
Fast enough to inform a purchase or a go/no-go decision.
Already have engineered septic or OWTS plans? Upload the PDF for an instant Colorado installation estimate, then have Tri-Lakes, a licensed Colorado OWTS installer, price and build the system.
$2,000 — and it's credited toward your project if you move forward, so it's effectively a deposit on real work.
Typically within three business days of the site visit.
A licensed inspection, drone photos, setback/slope/soil assessment, a county code check, and a build-cost outlook — a real plan for the lot.
Yes — it's the cheapest way to avoid buying a lot you can't affordably build on.